Sovereign Source

Aegis Advanced Systems · curated network plus sourcing software

1 eligible1 manual review3 ineligible

RFQs in Progress

1

2 ready to match

Needs Review

2

Evidence or manual states

Access Suspensions

1

Expired or expiring evidence

Audit Events

5

Sensitive actions logged

Source intake

Start a controlled RFQ package

Attach the model, drawing, and PO/BOM package. Sovereign Source turns the package into reviewable requirements before buyer release.

Package readiness

0%

Upload or load a sample package to start.

No package attached

Upload files or load a sample package.

empty
Package files will appear here.

Requirements

1 signals
No package uploaded
FilesWaiting for upload
DrawingPDF drawing preferred
Line ItemsPO/BOM optional
WarningsWaiting for package

Qualified supplier shortlist

Ranked facility matches with access-state guardrails.

Vector Aero Machining

Vector Dayton Secure Cell

eligible

100 score · 42 day lead-time signal

Keystone Secure Fabrication

Keystone Controlled Facility

manual review

85 score · 52 day lead-time signal

Talon Precision Group

Talon Houston Precision

ineligible

44 score · 94 day lead-time signal