RFQs in Progress
1
2 ready to match
Needs Review
2
Evidence or manual states
Access Suspensions
1
Expired or expiring evidence
Audit Events
5
Sensitive actions logged
Source intake
Start a controlled RFQ package
Attach the model, drawing, and PO/BOM package. Sovereign Source turns the package into reviewable requirements before buyer release.
Package readiness
0%
Upload or load a sample package to start.
No package attached
Upload files or load a sample package.
Requirements
1 signalsQualified supplier shortlist
Ranked facility matches with access-state guardrails.
Vector Aero Machining
Vector Dayton Secure Cell
100 score · 42 day lead-time signal
Keystone Secure Fabrication
Keystone Controlled Facility
85 score · 52 day lead-time signal
Talon Precision Group
Talon Houston Precision
44 score · 94 day lead-time signal
| Supplier | Facility | Score | Lead Time | Access State |
|---|---|---|---|---|
| Vector Aero Machining | Vector Dayton Secure Cell | 100 | 42 day lead-time signal | eligible |
| Keystone Secure Fabrication | Keystone Controlled Facility | 85 | 52 day lead-time signal | manual review |
| Talon Precision Group | Talon Houston Precision | 44 | 94 day lead-time signal | ineligible |
Supplier Directory
Vector Aero Machining
Aerospace-focused 5-axis machining for titanium and nickel alloys with controlled-data handling procedures.
Facility
Vector Dayton Secure Cell
1210 Flightline Rd, Dayton, OH
CAGE 4VCTR
Machines
Hermle C42U Secure Cell · 31.5 x 31.5 x 21.7 in
| Process | Materials | Tolerance | Inspection |
|---|---|---|---|
| CNC 5-axis | Titanium, Inconel, Aluminum, Stainless | +/-0.0003 in | CMM, FAIR, AS9102 |
Compliance Evidence
Capacity Confidence
declared availability: status available, confidence 86, windowDays 21
rfq response time: medianHours 12, sampleSize 8
Evidence Review Queue
Nadcap
expiredArcForge Special ProcessesHeat treat scope, Long Beach facility.
Source: supplier upload · Expires 2025-01-15
Access suspended until renewed evidence is reviewed.
Reviewer note: Access suspended until renewed evidence is reviewed.
CMMC Level 2
manual requiredKeystone Secure FabricationCMMC UID captured; buyer confirmation required before controlled-data release.
Source: manual review · Expires not specified
Manual review required before this evidence can release controlled data.
Reviewer note: Manual review required; no autonomous SPRS/CMMC claim.
Work Package Builder
Matching Results
Vector Aero Machining
Vector Dayton Secure Cell
100
Process fit: CNC 5-axis.
Evidence valid for controlled RFQ routing.
Keystone Secure Fabrication
Keystone Controlled Facility
85
Process fit: CNC 5-axis.
Manual review required before release.
Talon Precision Group
Talon Houston Precision
44
Process fit: CNC 5-axis.
Missing compliance evidence: CMMC Level 2.
Plainview CNC Works
Plainview Main Shop
24
Lifecycle fit: developmental.
Missing required process: CNC 5-axis.
ArcForge Special Processes
ArcForge Thermal Processing
22
Lifecycle fit: mass production.
Missing required process: CNC 5-axis.
| Supplier | Capability | Evidence / Access | Score | Action |
|---|---|---|---|---|
Vector Aero Machining Vector Dayton Secure Cell | Process fit: CNC 5-axis. Declared availability: available (86 confidence). | eligible Evidence valid for controlled RFQ routing. | 100 | |
Keystone Secure Fabrication Keystone Controlled Facility | Process fit: CNC 5-axis. Declared availability: available_pending_cmmc_review (64 confidence). | manual review Manual review required before release. | 85 | |
Talon Precision Group Talon Houston Precision | Process fit: CNC 5-axis. Quoted lead-time history: 94 days. | ineligible Missing compliance evidence: CMMC Level 2. | 44 | |
Plainview CNC Works Plainview Main Shop | Lifecycle fit: developmental. Declared availability: available (72 confidence). | ineligible Missing required process: CNC 5-axis. | 24 | |
ArcForge Special Processes ArcForge Thermal Processing | Lifecycle fit: mass production. Declared availability: available_after_review (51 confidence). | ineligible Missing required process: CNC 5-axis. | 22 |
RFQ Dispatch
Vector Aero Machining
releasedpendingControlled titanium aerospace bracket · expires Jun 21, 2026
Awaiting supplier response.
Supplier RFQ Portal
Released data-room access ready.
Controlled titanium aerospace bracket
releasedpendingData-room access expires Jun 21, 2026. Blueprint files are not emailed.
Awaiting supplier response.
Audit Log
Audit Export
This view is formatted for a buyer review: who saw what, when, and why.
Who saw what, when, and why May 22, 12:00 PM | Mira Chen | Evidence reviewed ComplianceEvidence ev-a-itar | Status changed to VALID. May 22, 12:00 PM | Mira Chen | Classification approved WorkPackage wp-controlled-bracket | Classification gate: ITAR_TECHNICAL_DATA. May 22, 12:00 PM | Eli Mason | Matching run WorkPackage wp-controlled-bracket | Sensitive workflow event recorded for buyer review. May 22, 12:00 PM | Eli Mason | Rfq dispatched RFQ rfq-controlled-1 | Attachment policy: no_attachments. May 22, 12:00 PM | Cal Rivers | Document viewed Document doc-controlled-1 | Sensitive workflow event recorded for buyer review.
Evidence reviewed
May 22, 12:00 PM
Sovereign Source · ev-a-itar
{"status":"VALID","copy":"Evidence valid"}Classification approved
May 22, 12:00 PM
Sovereign Source · wp-controlled-bracket
{"classification":"ITAR_TECHNICAL_DATA"}Matching run
May 22, 12:00 PM
Aegis Advanced Systems · wp-controlled-bracket
{"eligible":1,"manualReview":1,"ineligible":3}Rfq dispatched
May 22, 12:00 PM
Aegis Advanced Systems · rfq-controlled-1
{"invites":["invite-a-controlled"],"attachmentPolicy":"no_attachments"}Document viewed
May 22, 12:00 PM
Vector Aero Machining · doc-controlled-1
{"inviteId":"invite-a-controlled","signedLink":"mock","watermark":"placeholder"}| Time | Action | Entity | Org | Metadata |
|---|---|---|---|---|
| May 22, 12:00 PM | Evidence reviewed | ComplianceEvidence · ev-a-itar | Sovereign Source | {"status":"VALID","copy":"Evidence valid"} |
| May 22, 12:00 PM | Classification approved | WorkPackage · wp-controlled-bracket | Sovereign Source | {"classification":"ITAR_TECHNICAL_DATA"} |
| May 22, 12:00 PM | Matching run | WorkPackage · wp-controlled-bracket | Aegis Advanced Systems | {"eligible":1,"manualReview":1,"ineligible":3} |
| May 22, 12:00 PM | Rfq dispatched | RFQ · rfq-controlled-1 | Aegis Advanced Systems | {"invites":["invite-a-controlled"],"attachmentPolicy":"no_attachments"} |
| May 22, 12:00 PM | Document viewed | Document · doc-controlled-1 | Vector Aero Machining | {"inviteId":"invite-a-controlled","signedLink":"mock","watermark":"placeholder"} |