Sovereign Source MVP

Logged in as Aegis Advanced Systems · Curated network plus sourcing software.

1 eligible1 manual review3 ineligible

Demo data only

This public demo uses simulated suppliers, evidence, RFQs, files, and audit events. Do not upload or enter real controlled technical data.

manual review required when evidence cannot be verifiedaccess suspended when evidence expires
buyer workspacemanual review required for controlled data

Upload a drawing or PO, then route to curated qualified vendors

Start with a CAD package, PDF drawing, or purchase order line list. The workspace combines instant intake and capability routing with facility-level qualification, quality documentation, first-order monitoring, and strict evidence gates.

Current intake

2

files

3

line items

1

eligible

2 files loaded

Uploaded Package

controlled_titanium_bracket.step2.8 MB
PO-7421-line-items.xlsx44 KB

Detected Requirements

5-axis CNCTitanium+/-0.0005 inAS9100ITAR evidenceJCP DD2345CMMC Level 2CMM / FAIR

Defense Sourcing Model

Software-assisted intake and matching.

Curated supplier onboarding and facility review.

Human support stays attached to complex controlled jobs.

LineProcessMaterialQtyControlGate

AAS-7421-001

Controlled titanium aerospace bracket

CNC 5-axisTitanium25itar technical dataready

AAS-7421-002

CMM first article inspection report

OtherDocumentation1cuimanual review required

AAS-7421-003

Black anodize and passivation requirement

CoatingTitanium25itar technical dataaccess suspended

Factory/supplier audit status

Buyer-defined gate before controlled RFQ routing.

Quality documentation packet

Buyer-defined gate before controlled RFQ routing.

Strict compliance gates

Buyer-defined gate before controlled RFQ routing.

Human support for complex jobs

Buyer-defined gate before controlled RFQ routing.

Curated Network Pipeline

1

Upload

Drawing, model, PO, or line-item workbook received.

2

Extract

Part lines, process, material, quantity, inspection, and control markers are normalized.

3

Curate

Supplier onboarding, facility qualification, audit status, and quality documents are checked.

4

Match

Capability routing, lead-time signals, and supplier response history shape the shortlist.

5

Review

Complex jobs and controlled-data exceptions stay with a human reviewer.

6

Route

Only eligible suppliers receive secure data-room invites.

Software Layer

Instant RFQ intake

Drawing, PO, and BOM lines become structured sourcing requirements.

Capability routing

Process, material, tolerance, inspection, and quantity drive vendor fit.

Lead-time signal

Capacity and response-history signals guide shortlist priority.

Curated Qualification

Curated onboarding

Suppliers enter the network through buyer-approved evidence and facility review.

Facility qualification

Capability is tied to a specific facility, machine set, and evidence scope.

First-order monitoring

Initial jobs remain monitored for quality documentation and response discipline.

Vendor Shortlist

Vector Aero Machiningeligible

100 score · 42 day lead-time signal · Vector Dayton Secure Cell

Facility-level qualification complete.

First-order monitoring: quality packet and response cadence tracked.

Human support: release review before controlled data-room invite.

Evidence valid for routing.

Keystone Secure Fabricationmanual review

85 score · 52 day lead-time signal · Keystone Controlled Facility

Facility evidence queued for reviewer approval.

First-order monitoring starts after evidence review.

Human support: reviewer must clear the exception.

Manual review required before routing.

Talon Precision Groupineligible

44 score · 94 day lead-time signal · Talon Houston Precision

Curated network gate failed for this package.

First-order monitoring unavailable while access is suspended.

Human support: buyer can request remediation, not automatic release.

Access suspended for controlled routing.

Next Action

Evidence valid suppliers can receive a secure RFQ invite.

Manual review required suppliers stay out of automatic routing.

Access suspended suppliers cannot receive controlled files.

Role Switcher

Active demo role

Buyer

Create the controlled bracket RFQ, run matching, and release eligible invites.

RFQs in Progress

1

2 ready to match

Needs Review

2

Evidence or manual states

Access Suspensions

1

Expired or expiring evidence

Audit Events

5

Sensitive actions logged

Controlled Titanium Bracket Walkthrough

Supplier Directory

Vector Aero Machining

Aerospace-focused 5-axis machining for titanium and nickel alloys with controlled-data handling procedures.

scaling

Facility

Vector Dayton Secure Cell

1210 Flightline Rd, Dayton, OH

CAGE 4VCTR

Machines

Hermle C42U Secure Cell · 31.5 x 31.5 x 21.7 in

ProcessMaterialsToleranceInspection
CNC 5-axisTitanium, Inconel, Aluminum, Stainless+/-0.0003 inCMM, FAIR, AS9102

Compliance Evidence

AS9100valid
ITAR registration evidencevalid
JCP DD2345valid
CMMC Level 2valid
Customer approvedvalid

Capacity Confidence

declared availability: status available, confidence 86, windowDays 21

rfq response time: medianHours 12, sampleSize 8

Evidence Review Queue

Nadcap

expiredArcForge Special Processes

Heat treat scope, Long Beach facility.

Source: supplier upload · Expires 2025-01-15

Access suspended until renewed evidence is reviewed.

Reviewer note: Access suspended until renewed evidence is reviewed.

CMMC Level 2

manual requiredKeystone Secure Fabrication

CMMC UID captured; buyer confirmation required before controlled-data release.

Source: manual review · Expires not specified

Manual review required before this evidence can release controlled data.

Reviewer note: Manual review required; no autonomous SPRS/CMMC claim.

Work Package Builder

Required evidence

Matching Results

Vector Aero Machining

eligibleVector Dayton Secure Cell

Reasons

  • Process fit: CNC 5-axis.
  • Material fit: Titanium.
  • Tolerance fit: capability reaches +/-0.0003 in.
  • AS9100 evidence valid for scope: Precision CNC machining, Dayton facility.
  • ITAR registration evidence evidence valid for scope: Manual reviewer confirmed current DDTC registration evidence..
  • JCP DD2345 evidence valid for scope: DD2345 evidence for access to export-controlled technical data..
  • CMMC Level 2 evidence valid for scope: Buyer-reviewed CMMC Level 2 evidence for controlled program flowdown..
  • Lifecycle fit: scaling.
  • Capacity Confidence uses 2 signal(s), not live machine availability.

Blockers

None

Capacity Confidence Signals

  • Declared availability: available (86 confidence).
  • Median RFQ response: 12 hours.

100

match score

Keystone Secure Fabrication

manual reviewKeystone Controlled Facility

Reasons

  • Process fit: CNC 5-axis.
  • Material fit: Titanium.
  • Tolerance fit: capability reaches +/-0.0005 in.
  • AS9100 evidence valid for scope: Machining and fabrication, Erie facility..
  • ITAR registration evidence evidence valid for scope: Manual ITAR evidence..
  • JCP DD2345 evidence valid for scope: DD2345 evidence..
  • Lifecycle fit: scaling.
  • Capacity Confidence uses 1 signal(s), not live machine availability.
  • CMMC Level 2 requires manual review for scope: CMMC UID captured; buyer confirmation required before controlled-data release..

Blockers

None

Capacity Confidence Signals

  • Declared availability: available_pending_cmmc_review (64 confidence).

85

match score

Talon Precision Group

ineligibleTalon Houston Precision

Reasons

  • Process fit: CNC 5-axis.
  • Material fit: Titanium.
  • Tolerance fit: capability reaches +/-0.0002 in.
  • AS9100 evidence valid for scope: Precision 5-axis machining..
  • ITAR registration evidence evidence valid for scope: Manual ITAR evidence for Houston precision facility..
  • JCP DD2345 evidence valid for scope: DD2345 evidence..
  • Lifecycle fit: mass production.
  • Capacity Confidence uses 2 signal(s), not live machine availability.

Blockers

  • Missing compliance evidence: CMMC Level 2.

Capacity Confidence Signals

  • Quoted lead-time history: 94 days.
  • No-bid signal: 38% with capacity noted.

44

match score

Plainview CNC Works

ineligiblePlainview Main Shop

Reasons

  • Lifecycle fit: developmental.
  • Capacity Confidence uses 1 signal(s), not live machine availability.

Blockers

  • Missing required process: CNC 5-axis.
  • Missing compliance evidence: AS9100.
  • Missing compliance evidence: ITAR registration evidence.
  • Missing compliance evidence: JCP DD2345.
  • Missing compliance evidence: CMMC Level 2.

Capacity Confidence Signals

  • Declared availability: available (72 confidence).

24

match score

ArcForge Special Processes

ineligibleArcForge Thermal Processing

Reasons

  • Lifecycle fit: mass production.
  • Capacity Confidence uses 1 signal(s), not live machine availability.

Blockers

  • Missing required process: CNC 5-axis.
  • Missing compliance evidence: AS9100.
  • Missing compliance evidence: ITAR registration evidence.
  • Missing compliance evidence: JCP DD2345.
  • Missing compliance evidence: CMMC Level 2.

Capacity Confidence Signals

  • Declared availability: available_after_review (51 confidence).

22

match score

RFQ Dispatch

Vector Aero Machining

releasedpending

Controlled titanium aerospace bracket · expires Jun 21, 2026

Awaiting supplier response.

Supplier RFQ Portal

Released data-room access ready.

Controlled titanium aerospace bracket

releasedpending

Data-room access expires Jun 21, 2026. Blueprint files are not emailed.

Awaiting supplier response.

Audit Log

Audit Export

This view is formatted for a buyer review: who saw what, when, and why.

Download Audit Export
Who saw what, when, and why
May 22, 12:00 PM | Mira Chen | Evidence reviewed ComplianceEvidence ev-a-itar | Status changed to VALID.
May 22, 12:00 PM | Mira Chen | Classification approved WorkPackage wp-controlled-bracket | Classification gate: ITAR_TECHNICAL_DATA.
May 22, 12:00 PM | Eli Mason | Matching run WorkPackage wp-controlled-bracket | Sensitive workflow event recorded for buyer review.
May 22, 12:00 PM | Eli Mason | Rfq dispatched RFQ rfq-controlled-1 | Attachment policy: no_attachments.
May 22, 12:00 PM | Cal Rivers | Document viewed Document doc-controlled-1 | Sensitive workflow event recorded for buyer review.
TimeActionEntityOrgMetadata
May 22, 12:00 PMEvidence reviewedComplianceEvidence · ev-a-itarSovereign Source{"status":"VALID","copy":"Evidence valid"}
May 22, 12:00 PMClassification approvedWorkPackage · wp-controlled-bracketSovereign Source{"classification":"ITAR_TECHNICAL_DATA"}
May 22, 12:00 PMMatching runWorkPackage · wp-controlled-bracketAegis Advanced Systems{"eligible":1,"manualReview":1,"ineligible":3}
May 22, 12:00 PMRfq dispatchedRFQ · rfq-controlled-1Aegis Advanced Systems{"invites":["invite-a-controlled"],"attachmentPolicy":"no_attachments"}
May 22, 12:00 PMDocument viewedDocument · doc-controlled-1Vector Aero Machining{"inviteId":"invite-a-controlled","signedLink":"mock","watermark":"placeholder"}

Buyer-Facing Artifacts

Sellable Pilot Scope

Minimum Sellable Architecture

Real auth and RBAC

Persistent database with tenant isolation

Server-side matching and document-access checks

Object storage with signed URLs

Server-side audit log

Evidence files with expiration tracking

Invite tokens that expire and revoke server-side

Admin console for demo data, suppliers, reviewers, and buyer orgs

First Paid Pilot Product Scope

Supplier directory

Evidence vault

Work package builder

Classification approval gate

Deterministic match results

Secure RFQ invite and data-room flow

Supplier response and no-bid flow

Exportable audit trail