Demo data only
This public demo uses simulated suppliers, evidence, RFQs, files, and audit events. Do not upload or enter real controlled technical data.
Upload a drawing or PO, then route to curated qualified vendors
Start with a CAD package, PDF drawing, or purchase order line list. The workspace combines instant intake and capability routing with facility-level qualification, quality documentation, first-order monitoring, and strict evidence gates.
Current intake
2
files
3
line items
1
eligible
2 files loaded
Uploaded Package
Detected Requirements
Defense Sourcing Model
Software-assisted intake and matching.
Curated supplier onboarding and facility review.
Human support stays attached to complex controlled jobs.
| Line | Process | Material | Qty | Control | Gate |
|---|---|---|---|---|---|
AAS-7421-001 Controlled titanium aerospace bracket | CNC 5-axis | Titanium | 25 | itar technical data | ready |
AAS-7421-002 CMM first article inspection report | Other | Documentation | 1 | cui | manual review required |
AAS-7421-003 Black anodize and passivation requirement | Coating | Titanium | 25 | itar technical data | access suspended |
Factory/supplier audit status
Buyer-defined gate before controlled RFQ routing.
Quality documentation packet
Buyer-defined gate before controlled RFQ routing.
Strict compliance gates
Buyer-defined gate before controlled RFQ routing.
Human support for complex jobs
Buyer-defined gate before controlled RFQ routing.
Curated Network Pipeline
Upload
Drawing, model, PO, or line-item workbook received.
Extract
Part lines, process, material, quantity, inspection, and control markers are normalized.
Curate
Supplier onboarding, facility qualification, audit status, and quality documents are checked.
Match
Capability routing, lead-time signals, and supplier response history shape the shortlist.
Review
Complex jobs and controlled-data exceptions stay with a human reviewer.
Route
Only eligible suppliers receive secure data-room invites.
Software Layer
Instant RFQ intake
Drawing, PO, and BOM lines become structured sourcing requirements.
Capability routing
Process, material, tolerance, inspection, and quantity drive vendor fit.
Lead-time signal
Capacity and response-history signals guide shortlist priority.
Curated Qualification
Curated onboarding
Suppliers enter the network through buyer-approved evidence and facility review.
Facility qualification
Capability is tied to a specific facility, machine set, and evidence scope.
First-order monitoring
Initial jobs remain monitored for quality documentation and response discipline.
Vendor Shortlist
100 score · 42 day lead-time signal · Vector Dayton Secure Cell
Facility-level qualification complete.
First-order monitoring: quality packet and response cadence tracked.
Human support: release review before controlled data-room invite.
Evidence valid for routing.
85 score · 52 day lead-time signal · Keystone Controlled Facility
Facility evidence queued for reviewer approval.
First-order monitoring starts after evidence review.
Human support: reviewer must clear the exception.
Manual review required before routing.
44 score · 94 day lead-time signal · Talon Houston Precision
Curated network gate failed for this package.
First-order monitoring unavailable while access is suspended.
Human support: buyer can request remediation, not automatic release.
Access suspended for controlled routing.
Next Action
Evidence valid suppliers can receive a secure RFQ invite.
Manual review required suppliers stay out of automatic routing.
Access suspended suppliers cannot receive controlled files.
Role Switcher
Active demo role
Buyer
Create the controlled bracket RFQ, run matching, and release eligible invites.
RFQs in Progress
1
2 ready to match
Needs Review
2
Evidence or manual states
Access Suspensions
1
Expired or expiring evidence
Audit Events
5
Sensitive actions logged
Controlled Titanium Bracket Walkthrough
Supplier Directory
Vector Aero Machining
Aerospace-focused 5-axis machining for titanium and nickel alloys with controlled-data handling procedures.
Facility
Vector Dayton Secure Cell
1210 Flightline Rd, Dayton, OH
CAGE 4VCTR
Machines
Hermle C42U Secure Cell · 31.5 x 31.5 x 21.7 in
| Process | Materials | Tolerance | Inspection |
|---|---|---|---|
| CNC 5-axis | Titanium, Inconel, Aluminum, Stainless | +/-0.0003 in | CMM, FAIR, AS9102 |
Compliance Evidence
Capacity Confidence
declared availability: status available, confidence 86, windowDays 21
rfq response time: medianHours 12, sampleSize 8
Evidence Review Queue
Nadcap
expiredArcForge Special ProcessesHeat treat scope, Long Beach facility.
Source: supplier upload · Expires 2025-01-15
Access suspended until renewed evidence is reviewed.
Reviewer note: Access suspended until renewed evidence is reviewed.
CMMC Level 2
manual requiredKeystone Secure FabricationCMMC UID captured; buyer confirmation required before controlled-data release.
Source: manual review · Expires not specified
Manual review required before this evidence can release controlled data.
Reviewer note: Manual review required; no autonomous SPRS/CMMC claim.
Work Package Builder
Matching Results
Vector Aero Machining
eligibleVector Dayton Secure CellReasons
- Process fit: CNC 5-axis.
- Material fit: Titanium.
- Tolerance fit: capability reaches +/-0.0003 in.
- AS9100 evidence valid for scope: Precision CNC machining, Dayton facility.
- ITAR registration evidence evidence valid for scope: Manual reviewer confirmed current DDTC registration evidence..
- JCP DD2345 evidence valid for scope: DD2345 evidence for access to export-controlled technical data..
- CMMC Level 2 evidence valid for scope: Buyer-reviewed CMMC Level 2 evidence for controlled program flowdown..
- Lifecycle fit: scaling.
- Capacity Confidence uses 2 signal(s), not live machine availability.
Blockers
None
Capacity Confidence Signals
- Declared availability: available (86 confidence).
- Median RFQ response: 12 hours.
100
match score
Keystone Secure Fabrication
manual reviewKeystone Controlled FacilityReasons
- Process fit: CNC 5-axis.
- Material fit: Titanium.
- Tolerance fit: capability reaches +/-0.0005 in.
- AS9100 evidence valid for scope: Machining and fabrication, Erie facility..
- ITAR registration evidence evidence valid for scope: Manual ITAR evidence..
- JCP DD2345 evidence valid for scope: DD2345 evidence..
- Lifecycle fit: scaling.
- Capacity Confidence uses 1 signal(s), not live machine availability.
- CMMC Level 2 requires manual review for scope: CMMC UID captured; buyer confirmation required before controlled-data release..
Blockers
None
Capacity Confidence Signals
- Declared availability: available_pending_cmmc_review (64 confidence).
85
match score
Talon Precision Group
ineligibleTalon Houston PrecisionReasons
- Process fit: CNC 5-axis.
- Material fit: Titanium.
- Tolerance fit: capability reaches +/-0.0002 in.
- AS9100 evidence valid for scope: Precision 5-axis machining..
- ITAR registration evidence evidence valid for scope: Manual ITAR evidence for Houston precision facility..
- JCP DD2345 evidence valid for scope: DD2345 evidence..
- Lifecycle fit: mass production.
- Capacity Confidence uses 2 signal(s), not live machine availability.
Blockers
- Missing compliance evidence: CMMC Level 2.
Capacity Confidence Signals
- Quoted lead-time history: 94 days.
- No-bid signal: 38% with capacity noted.
44
match score
Plainview CNC Works
ineligiblePlainview Main ShopReasons
- Lifecycle fit: developmental.
- Capacity Confidence uses 1 signal(s), not live machine availability.
Blockers
- Missing required process: CNC 5-axis.
- Missing compliance evidence: AS9100.
- Missing compliance evidence: ITAR registration evidence.
- Missing compliance evidence: JCP DD2345.
- Missing compliance evidence: CMMC Level 2.
Capacity Confidence Signals
- Declared availability: available (72 confidence).
24
match score
ArcForge Special Processes
ineligibleArcForge Thermal ProcessingReasons
- Lifecycle fit: mass production.
- Capacity Confidence uses 1 signal(s), not live machine availability.
Blockers
- Missing required process: CNC 5-axis.
- Missing compliance evidence: AS9100.
- Missing compliance evidence: ITAR registration evidence.
- Missing compliance evidence: JCP DD2345.
- Missing compliance evidence: CMMC Level 2.
Capacity Confidence Signals
- Declared availability: available_after_review (51 confidence).
22
match score
RFQ Dispatch
Vector Aero Machining
releasedpendingControlled titanium aerospace bracket · expires Jun 21, 2026
Awaiting supplier response.
Supplier RFQ Portal
Released data-room access ready.
Controlled titanium aerospace bracket
releasedpendingData-room access expires Jun 21, 2026. Blueprint files are not emailed.
Awaiting supplier response.
Audit Log
Audit Export
This view is formatted for a buyer review: who saw what, when, and why.
Who saw what, when, and why May 22, 12:00 PM | Mira Chen | Evidence reviewed ComplianceEvidence ev-a-itar | Status changed to VALID. May 22, 12:00 PM | Mira Chen | Classification approved WorkPackage wp-controlled-bracket | Classification gate: ITAR_TECHNICAL_DATA. May 22, 12:00 PM | Eli Mason | Matching run WorkPackage wp-controlled-bracket | Sensitive workflow event recorded for buyer review. May 22, 12:00 PM | Eli Mason | Rfq dispatched RFQ rfq-controlled-1 | Attachment policy: no_attachments. May 22, 12:00 PM | Cal Rivers | Document viewed Document doc-controlled-1 | Sensitive workflow event recorded for buyer review.
| Time | Action | Entity | Org | Metadata |
|---|---|---|---|---|
| May 22, 12:00 PM | Evidence reviewed | ComplianceEvidence · ev-a-itar | Sovereign Source | {"status":"VALID","copy":"Evidence valid"} |
| May 22, 12:00 PM | Classification approved | WorkPackage · wp-controlled-bracket | Sovereign Source | {"classification":"ITAR_TECHNICAL_DATA"} |
| May 22, 12:00 PM | Matching run | WorkPackage · wp-controlled-bracket | Aegis Advanced Systems | {"eligible":1,"manualReview":1,"ineligible":3} |
| May 22, 12:00 PM | Rfq dispatched | RFQ · rfq-controlled-1 | Aegis Advanced Systems | {"invites":["invite-a-controlled"],"attachmentPolicy":"no_attachments"} |
| May 22, 12:00 PM | Document viewed | Document · doc-controlled-1 | Vector Aero Machining | {"inviteId":"invite-a-controlled","signedLink":"mock","watermark":"placeholder"} |
Buyer-Facing Artifacts
2-minute demo script
Talk track for the controlled titanium bracket walkthrough.
One-page product brief
Buyer-facing positioning, target users, and MVP value.
Pilot proposal
Supplier evidence graph plus controlled RFQ routing pilot scope.
Sample ROI claim
Conservative ROI framing around fewer wasted RFQs and lower data-release risk.
Sellable Pilot Scope
Minimum Sellable Architecture
Real auth and RBAC
Persistent database with tenant isolation
Server-side matching and document-access checks
Object storage with signed URLs
Server-side audit log
Evidence files with expiration tracking
Invite tokens that expire and revoke server-side
Admin console for demo data, suppliers, reviewers, and buyer orgs
First Paid Pilot Product Scope
Supplier directory
Evidence vault
Work package builder
Classification approval gate
Deterministic match results
Secure RFQ invite and data-room flow
Supplier response and no-bid flow
Exportable audit trail